Our  On-Going Project

Track Record (Current On-Going)










ON-GOINGName of Client
Name 
of
 Consultant
Contract Value
Role in Project
Commencement Date

1D/132/17: CONSTRUCTION OF PEDESTRIAN OVERHEAD BRIDGE AND LINKWAY:
CONSTRUCTION OF PEDESTRIAN OVERHEAD BRIDGE AND LINKWAY AT SENGKANG EAST WAY (HOCKEY STADIUM)
CONSTRUCTION OF PEDESTRIAN OVERHEAD BRIDGE AND LINKWAY AT PUNGGOL WAY
CONSTRUCTION OF SIGNALISED PEDESTRIAN CROSSING AT SENTUL
CRESCENT
 
 
 
 
 HDB
 
 
 
 
 
AECOM
Singapore Pte Ltd

 
 
 
 
 
MC
 
 
 
 
 
4/4/2017
 
2NORTHPOINT CITY
PROPOSED ERECTION OF A 3 STOREY PODIUM BLOCK CONSISTING OF RETAIL, COMMUNITY CLUB AND BUS INTERCHANGE WITH 2 BASEMENTS & MEZZANINE OF RETAIL & CARPARKS AND 10 STOREY RESIDENTIAL DEVELOPMENT ABOVE (920 UNITS) WITH CLUBHOUSE, SWIMMING POOL & COMMUNAL FACILITIES ON LOT 03685 MK 19 AT YISHUN CENTRAL
1/YISHUN AVENUE 2 (YISHUN PLANNING AREA)
- Construction of POB, Linkway and Bus
Stop
 
 
 
 
NORTH GEM DEVELOPMENT PTE LTD & FC NORTH GEM TRUSTEE PTE LTD
 
 
 
 
 
ADDP ARCHITECTS LLP

 
 
 
SC MC: LUM CHANG BUILDING
CONTRACTORS PTE LTD
 
 
 
 
 


 
30/5/2017
 
3D/306/17: (A)PROPOSED RAISED ZEBRA CROSSING IN SENGKANG TOWN (B) CONSTRUCTION OF PEDESTRIAN OVERHEAD BRIDGE AND COVERED LINKWAY ALONG SENGKANG EAST WAY (C) CONSTRUCTION OF BUS BAYS, BUS SHELTERS ALONG SENGKANG EAST WAY, FERNVALE STREET AND ANCHORVALE CRESCENT 
 
 
 
 HDB
 
 

MOTT 
MACDONALD
(S) PTE LTD

 
 
 
 
 
MC
 
 
 
 
 
28/8/2017
 
4D/321/17: (A) WIDENING OF CIRCUIT ROAD (B) CONSTRUCTION OF SIGNALISED PEDESTRIAN CROSSING ALONG PASIR RIS DRIVE 3 
 HDB
 
FONG CONSULT PTE LTD

 
 
MC
 
 
21/9/2017


Contact as for more details.


  

I BUILT MY SITE FOR FREE USING